Ground reinforcement work | SMD method that facilitates smooth processing of confirmation applications with efficient approval procedures.
The SMD method, which has ministerial certification and is optimal for structures subject to administrative guidance during the application for confirmation, such as those with a design bearing capacity exceeding 30 kN/m², existing retaining walls, and buildings with basements.
Ground reinforcement work is a foundational technology that physically prevents the risk of uneven settlement faced by building structures and ensures the long-term structural safety of buildings. The SMD pile method provided by Geotech Co., Ltd. is a highly reliable construction method certified by the Minister of Land, Infrastructure, Transport and Tourism, developed to address complex structures subject to building confirmation applications and administrative guidance. This method demonstrates its true value under stringent design conditions, such as buildings with basements where the design ground bearing capacity exceeds 30 kN/m², existing retaining walls requiring embedment to the angle of repose, and steel-framed buildings of 3 to 4 stories. In cases where ground improvement methods result in insufficient bearing capacity and precast pile installation leads to excessive specifications and high costs, it provides overwhelming end bearing capacity and excellent economic efficiency to solve these issues. It is equipped with an objective and clear bearing capacity calculation formula derived from standard penetration tests (N values), allowing for rapid and smooth passage through administrative reviews. We offer a consistent system from consultation to design support and on-site management, proposing safe and rational ground reinforcement solutions.
- Company:ジオテック
- Price:Other